This 380,000 SF distribution center consists of a structural steel frame with an insulated “sandwich” concrete panel system for its exterior walls. The facility has 203 panels weighing up to 30 tons apiece; each was “face-lifted” to provide the best possible color and texture consistency. During the 10-month construction period, 16,590 cubic yards of concrete was placed and finished. This distribution center houses a state-of-the-art computerized conveyor system.